- Cut the tracks according with the shown formula and then, drill.
50
- Introducing DN 80 stoppers, carriers and pulley stopper in the positions shown in
the diagram.
- Fix the track to the ceiling, taking into consideration the distance which is shown
in the drawing. (Fixtures not included).
PF
23 min
- After fi xing, clean the track grooves to
avoid possible leftover residues.
Track, carrier and stopper installation
LR
300
300
LR = 4AP - 2T
R
300
50
50
300
step 1
17