Installation; Installation Measurements - Daikin Rotex GW-20 C22 Instrucciones De Instalación

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 270
4

INSTALLATION

4.1

Installation measurements

Unit with pipes connected downwards:
Unit + wall mounting strip
A =
Supply CH
B =
Return CH
C =
Gas
D =
Tap water cold
E =
Tap water warm
F =
Condense outlet
h=
517mm
577mm
637mm
H=
590mm
650mm
710mm
Z =
Flue gas outlet/air inlet
G ¾" (ext)
G ¾" (ext)
G ½" (int)
R ½"
R ½"
Ø dn25 (flexible)
RKOMB22AAV1H
RKOMB28AAV1H
RKOMB33AAV1H
RKOMB22AAV1H
RKOMB28AAV1H
RKOMB33AAV1H
Ø60/100 (concentric)
11
Tabla de contenido
loading

Tabla de contenido