GB
Installation
Switch off supply voltage!
NOTE
If, when installing the device, the physical address has not
yet been allocated, the programming button (Fig. 1, Pos. 3)
must remain accessible.
Mode of Installation
Lift off the two external caps on built-in device 6958 EB-
500. The device is fixed in position by means of screws
inserted through the oblong holes.
Connect the Powernet EIB (Fig. 1, Pos. 4) and the control
lines (Fig 1, Pos. 1) in accordance with the terminal diagram
(Fig. 2).
Please also follow the connection instructions given under
"Technical Data".