Welding area assessment
Before installing the machine, the user must evaluate the possible electromagnetic problems that may arise in the area where
the installation is planned.
. In particular, it should consider the following:
a) the presence of other power cables (power supply cables, telephone cables, command cable, etc...)above, below and on the
sides of the arc welding machine.
b) television transmitters and receivers ;
c) computers and other hardware;
d) critical safety equipment such as industrial machine protections;
e) the health and safety of the people in the area such as people with pacemakers or hearing aids;
f) calibration and measuring equipment
g)The isolation of the equipment from other machinery.
The user will have to make sure that the devices and equipments that are in the same room are compatible with each other.
This may require extra precautions;
h) make sure of the exact hour when the welding and/or other operations will take place.
The surface of the area to be considered around the device depends on the the building's structure and other activities that take
place there. The area taken in consideration can be larger than the limits determined by the companies.
Welding area assessment
Besides the welding area, the assessment of the arc welding systems intallation itself can be used to identify and resolve cases
of disturbances. The assessment of emissions must include in situ measurements as specified in Article 10 of CISPR 11: 2009.
In situ measurements can also be used to confirm the effectiveness of mitigation measures.
RECOMMENDATION ON METHODS OF ELECTROMAGNETIC EMISSIONS REDUCTION
a. National power grid: The arc welding machine must be connected to the national power grid in accordance with the
manufacturer's recommendation. If interferences occur, it may be necessary to take additional preventive measures such as the
filtering of the power suplly network. Consideration should be given to shielding the power supply cable in a metal conduit. It is
necessary to ensure the shielding's electrical continuity along the cable's entire length. The shielding should be connected to the
welding current's source to ensure good electrical contact between the conduct and the casing of the welding current source.
b. Maintenance of the arc welding equipment: The arc welding machine should be be submitted to a routine maintenance
check according to the manufacturer's recommendations. All accesses, service doors and covers should be closed and properly
locked when the arc welding equipment is on.. The arc welding equipment must not be modified in any way, except for the
changes and settings outlined in the manufacturer's instructions. The spark gap of the arc start and arc stabilization devices must
be adjusted and maintained according to the manufacturer's recommendations.
c. Welding cables: Cables must be as short as possible, close to each other and close to the ground, if not on the ground.
d. Electrical bonding : consideration shoud be given to bonding all metal objects in the surrounding area. However, metal
objects connected to the workpiece increase the riskof electric shock if the operator touches both these metal elements and the
electrode. It is necessary to insulate the operator from such metal objects.
e. Earthing of the welded part : When the part is not earthed - due to electrical safety reasons or because of its size and its
location (which is the case with ship hulls or metallic building structures), the earthing of the part can, in some cases but not
systematically, reduce emissions It is preferable to avoid the earthing of parts that could increase the risk of injury to the users
or damage other electrical equipment. If necessary, it is appropriate that the earthing of the part is done directly, but in some
countries that do not allow such a direct connection, it is appropriate that the connection is made with a capacitor selected
according to national regulations.
f. Protection and plating : The selective protection and plating of other cables and devices in the area can reduce perturbation
issues. The protection of the entire welding area can be considered for specific situations.
TRANSPORT AND TRANSIT OF THE WELDING MACHINE
The machine is fitted with handle(s) to facilitate transportation. Be careful not to underestimate the
machine's weight. The handle(s) cannot be used for slinging.
Do not use the cables or torch to move the machine. The welding equipment must be moved in an upright position.
Do not place/carry the unit over people or objects.
Never lift the machine while there is a gas cylinder on the support shelf. A clear path is available when moving the item. The
removal of the wire reel from the machine is recommended before undertaking any lifting operation.