Components And Functions; Technical Specifications; Installation - Weinmann & Schanz DRAIN-UNIT Manual De Instrucciones

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 1
4.

COMPONENTS AND FUNCTIONS

1. Solar pump.
2. Circuit draining and filling valve.
3. Filling taps.
4. Air draining chamber.
This element stores the fluid of the primary
circuit when the system is stationary and the
air from the collector field when the pump is
running.
5. Pressure gauge.
6. Safety valve set to 3bar.
7. Flow meter and level indication.
The flow may be adjusted on this element
which also indicates the fluid level we have on
the primary circuit.
8. Expanded Polypropylene insulating housing
(EPP).
9. Solar controller (in systems with control
included).
5.

TECHNICAL SPECIFICATIONS

Valve Material: Brass according to standard EN12165.
Material separation tank AISI 304.
Sealing material: EPDM.
Connections: ½ " M or 15mm copper piping.
Maximum operating temperature 110 º C.
Maximum working pressure: 3 bar.
Safety valve set to 3 bar.
Flow indicator range: 2-12 l/min.
Pressure gauge 0-10 bar.
Connection to drain tap: ¾ "M or flexible.
Extended Polypropylene Density 40 gr/l.
Air Separation Capacity: 8 or 16 litres depending on the model.
6.

INSTALLATION

Positioning and fixing to the wall.
The Drain-Unit can be installed at any height on the solar collectors within the ranges established for
the different models. The less height there is between the collectors and the Drain-Unit, the less power
required from the pumps and, therefore, the greater the efficiency of the system.
Installation must always be above the primary circuit heat exchanger.
The selected location must be on the inside of the building and in a dry place.
4
8
10
6
3
5
7
1
2
9
Tabla de contenido
loading

Tabla de contenido