Sartorius YDO05FC-X Instrucciones De Instalación página 3

Idiomas disponibles
  • ES

Idiomas disponibles

Description: Installation of YDO05 FC-X Data Output Card in FC..BBE-X,
IS..BBE-X, FC..CCE-X and IS..CCE-X Models
!
Important note:
– All connected equipment must be switched off and disconnected from power (mains).
– To avoid irreparable damage to the components, the equipment must be free of voltage
before a data output is installed or removed.
– Make sure the seals are correctly positioned when re-assembling the equipment.
Replace any defective seals.
Packaging
Adapter housing (1) with
data output cable (2) and
power supply cable (3)
Data output card (4)
Adhesive label (6)
Screw with washer (5)
Remove the load plate, the load plate support and the dust cover from the scale.
Turn the scale over (so that the bottom of the scale (12) faces up) and lay it on a padded
surface.
Note: The scale must not rest on its load plate retainer!
Remove the three screws (11) from the bottom of the scale (12).
Turn the scale right side up (load plate retainer on top).
Remove the top of the scale (13).
Remove the screws (10) from the adapter housing (7).
3
loading