2) Installation guide
Upon installation, the Modbar module must
be primed before use. This is accomplished
by the following steps.
• Ensure that filtered water is supplied to
the module.
• Ensure that the power switch is in the off
position.
• Ensure that the module power cable is
plugged into its appropriate power source.
• Turn the power switch counter-clockwise
to place it in standby mode.
• The module will begin to fill the boiler.
Once the maximum fill level is achieved,
the module will cease to fill. When full,
the sight glass will be approximately half
full of water.
• At this point, it is safe to turn the switch
clockwise into operating mode.
3) General Use
During general use, the module is already
primed, and it is not necessary to prime the
system. To start the module, follow these
steps:
• Ensure that filtered water is supplied to
the module.
• From the off position, turn the power
switch clockwise to place it into operating
mode.
TAP1
BREWING
TAP2
BREWING
WASTE/DRAIN
• At this point, the elements will begin to
heat. When each heat zone reaches set
temperature, the module is ready for use.
TAP1
LOW VOLTAGE
TAP2
LOW VOLTAGE
POWER SUPPLY
CORD
MAIN SWITCH
AND ELECTRICAL SUPPLY CONNECTION
BRAIDED HOSE
WATER TREATMENT
RECOMMENDED VALUES
www.lamarzocco.com/water_calculator
Fig. 3 - Installation guide
MAIN WATER
SUPPLY VALVE
13