Eaton Quadcast LED Instrucciones De Instalación página 4

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Installation Instructions - Quadcast LED
Maintenance
A regular maintenance schedule should be followed to
retain optimal light output and thermal performance. Optical
lens cleaning should be performed with a clean dry cloth to
remove any dust or other contaminants. Additional cleaning
can be performed with non-abrasive acrylic cleaning
solution.
Bird Guard Installation (Figure 8)
N
ote:
Bird Guard requires minimum 7" length of pendant
pipe (Supplied by others). Bird guard is suitable
for use with 1-gang, 2-gang, and 4" round UL wet
location listed junction boxes. Install bird guard after
fixture installation.
1.
Remove the bird guard screw.
2.
Gently open bird guard and slide around conduit.
3.
Align and insert metal tabs on bird guard with slots in
housing.
4.
Reinstall the bird guard screw to snug fit.
5.
Bend tabs on bird guard to secure to housing.
4
EATON
IB515002EN
Installation instructions
Pendant (Supplied
by Others)
Figure 8.
Pendant Bird Guard (QDPBG)
Bird Guard
Tabla de contenido
loading

Tabla de contenido