DUCASSE INDUSTRIAL SEGMENTA TWIN TL Instructivo De Montaje página 17

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

- Cut the tracks according with the shown formula and then, drill.
50
300
LR > ZP + AP + 30
- Insert lock braking carries and both ends of the track 1 (R1), in the positions shown in
the diagram.
- Similarly, introduce the carriers and stoppers at both ends of the track 2 (R2).
Note : Reel 1 (R1) for port 1 (P1) | Rail 2 (R2) to port 2 (P2)
- Fix the track to the ceiling, taking into consideration the distance which is shown in
the drawing. (Fixtures not included).
PF
23min
Y
R1
R2
- After fixing, clean the track grooves to
avoid possible leftover residues.
Track, carrier and stopper installation
LR
300
50
R1
R2
300
300
50
Y = 34, when:
20 - 25
Wood
Agata Profile
step 1
Y = E + 9, when:
26 - 35
Wood
Toledo Profile
17
Tabla de contenido
loading

Productos relacionados para DUCASSE INDUSTRIAL SEGMENTA TWIN TL

Tabla de contenido