LERBAKKEN 10, 8410 RØNDE DENMARK
9410 Power Control with backup.
Redundant 9410 Power Control with Backup.
Revision date:
2008-06-10
16
Version Revision
V2 R1
9410 - Product Version 9410-001
Use 9400 Cover to prevent
open Power Rail from
unintentional short circuit.
Power is supplied to the Power
Rail from two 9410 Power
Control Modules. Both modules
have connections for Normal
Supply and Backup Supply.
Prepared by:
PB
9410QA01
Use Endcaps to prevent
the Power Rail from
being short circuit by the
outer enclosure.
Page:
2/3