Installation Instructions - Water Worker G-5 Manuel Del Propietario E Instrucciones De Instalación

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

INSTALLATION INSTRUCTIONS

refer to typical installation diagram and photos.
1. Measure pre-charge pressure with a
tire gauge to ensure pressure is the
same as water pressure. Tank comes
charged to 40 psi. Increase pressure
as needed.
4. Open hot waer faucet to relieve
pressure. Close faucet when pressure
subsides (flow stops).
Read completely before proceeding and
Typical "Completed" Installation
2. Turn water heater to the lowest
temperature setting.
5. Apply Teflon
®
3. Shut off water supply main valve.
tape to tank threads.
6. Screw tank into saddle valve.
IMPORTANT, use wrench flats to
tighten tank into position.
Tabla de contenido
loading

Este manual también es adecuado para:

G-5lG-12G-12l

Tabla de contenido