4. INSTALLATION
4.1 Installation in drywall
1. For this type of installation it is necessary to place side panels lined up with
the front of the box containing the support.
To change the position of the plates, remove the side screws, reposition and
retighten the screws.
IMPORTANT: Before
starting the installation,
identify the location of
the studs that support the
drywall, to avoid
obstructions to the time of
the opening.
Usually there is a space of
62 cm between each one.
7 7