Installation Instructions - Woods PREMIER PRD6000E Manual Del Operador

Cortadoras de descarga trasera
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

NOTE: Use high lift blades for best performance if tractor does not have
enough horsepower for the high lift blades, then use low lift blades.
1. Using the tractor 3-point, or suitable lifting device, carefully lower deck onto 101.6 - 152.4 mm
(4" - 6") high blocks at each corner of the deck (X).
2. Make sure deck is stable before proceeding.
3. Wear safety glasses or goggles to prevent eye injury while drilling holes.
4. Clamp mulching kit in place. Make sure baffles are completely closed-off by the kit.
5. Inspect fit-up to confirm that there will be no contact between blades and kit at any time. Failure
to do so will result in product damage and possible injury.
6. Mark the holes to be drilled.
7. Once marked, remove the kit and carefully drill the holes out using a 14.3 mm (9/16") drill bit.
8. After holes are drilled, bolt the kit into place torquing bolts to 115 N-m (85 lbs-ft).
MAN1260 (4/09/2018)
MULCHING KIT (OPTIONAL)
REF
PART
QTY
A
1019430
1
PRD6000E Mulching kit
A
1019431
1
PRD7200E Mulching kit
A
1019432
1
PRD8400E Mulching kit
1
6100RP *
-
1/2 NC x 1-1/4 Cap screw GR5
2
11900RP *
-
1/2 NC Flanged lock nut
*
Standard Hardware, Obtain Locally

INSTALLATION INSTRUCTIONS

DESCRIPTION
Parts 31
Tabla de contenido
loading

Este manual también es adecuado para:

Premier prd7200ePremier prd8400e

Tabla de contenido