LG DLE3400 Serie Manual Del Propietário página 26

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

26 INSTALLATION
Three-Wire Direct Wire
• A 3-wire connection is NOT
permitted on new construction
after January 1, 1996.
• A UL-listed strain relief is required.
• Use UL-listed 3-wire, #10 AWG-
minimum copper conductor
cable. Allow at least 5 ft. (1.5 m)
length to allow for removal and
installation of dryer.
1
Remove 3.5-inch (8.9 cm) of the outer
covering from the wire. Strip 1 inch (2.5 cm)
insulation from each wire. Bend the ends of
the three wires into a hook shape.
2
Remove the terminal block access cover on
the upper back of the dryer.
3
Install a UL-listed strain relief into the power
cord through-hole.
4
Thread the 3-wire, #10 AWG-minimum copper
conductor power cable prepared in step 1
through the strain relief.
UL-Listed 3-Wire Power Cord
5
Attach the two hot leads (black and red) of the
power cord to the outer terminal block screws.
1" (2.5 cm)
Terminal Block
UL-Listed
Strain Relief
6
Attach the neutral (white) wire to the center
terminal block screw.
7
Connect the external ground (if required by
local codes) to the green ground screw.
8
Tighten all screws securely.
9
Reinstall the terminal block access cover.
Hot (Black) Neutral (White)
Ground
Screw
White Wire
from Dryer
harness
External Ground Wire (If
required by local codes)
Hot (Red)

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Dlg3401 serie

Tabla de contenido