AXIS Q7900 Installation Guide
AXIS Q7900 Rack (Front View)
Network Activity
PS 1-2 &
LEDs 1-4
Fan LEDs
PS1
PS 2
NETWORK
ACTIVITY
FANS
1
2
3
4
LOOP
POWE R
POWE R
POWER
6
6
5
5
4
4
3
3
2
2
1
1
Slot 1
Install the hardware
General placement requirements
The location of the AXIS Q7900 must meet the following requirements:
•
Ambient temperature: 0° to +45°C (32° to 113°F)
•
Relative humidity: 20-80%
•
Power source within 1.8 meters
•
There must be a minimum of 5cm free space on the top, bottom, front and rear of the AXIS
Q7900 to ensure adequate ventilation
•
No excessive dust
Placement requirements for installation in a 19" equipment rack
When mounting the AXIS Q7900 in an equipment rack, never stack other units directly on top - the
mounting brackets are not designed to support more than 1 unit.
•
Pozidriv screwdriver #1
•
Pozidriv screwdriver #3
•
The AXIS Q7900 must be grounded to the same ground as the equipment rack.
•
The equipment rack must be braced and bolted to the floor.
Fans button
Power supply 1
POWE R
POWER
POWE R
6
6
6
6
5
5
5
5
4
4
4
4
3
3
3
3
2
2
2
2
1
1
1
1
Axis Video
Encoder Blades
Power supply 2
POWE R
POWE R
POWE R
POWE R
6
6
6
6
5
5
5
5
4
4
4
4
3
3
3
3
2
2
2
2
1
1
1
1
Page 7
AXIS Q7900 Rack
POWE R
POWE R
POWE R
POWER
6
6
6
6
5
5
5
5
4
4
4
4
3
3
3
3
2
2
2
2
1
1
1
1
Slot 14