General Instructions
Nozzle Installa on:
Note: Nozzle should be installed fi rst.
See diagram below:
1. Place no.17 over no.14. Insert
no.16 into each side of no.17.
2. Apply tefl on tape or pipe joint
compound to threaded end of no.21.
Screw no.21 into no.17, rotate no.17
so that no 21 is facing front, ghten
no.16.
17
14
Faucet Installa on:
3. Shut off water supply and drain
lines. Drill (4) four holes, into
countertop where you are installing
no.1.
8" (for B-1172)
4" (for B-1171)
Ø 1"
4" (for B-1172)
2" (for B-1171)
4. Place no.1 into the (3) three
pre-drilled moun ng holes.
21
16
4" Min.
for no.23
Ø 1"
1
water
supply
5. Reinstall no.2 and no.3 back onto
no.1 shank under bo om of sink.
Connect water supply to no.1.
6. Tighten no.3 with a wrench.
Spray Hose/Diverter Installa on
7. Disassemble no.22, place shank
of no.22 thru hole for no.23. Tighten
locknut of no.22.
1
23
8. Apply tefl on tape to threaded end
of no.23. Insert no.23 through no.22
and a ach to no.1.
9. Turn on water supply and check for
leaks.
4
sink
2
3
water
supply
22
sink
22