Página 1
Installation Instructions PETK-1 for use with KSR, RSX, TSX, VSX self-regulating heating cables in conjunction with Thermon JB-K-EX, TED, Terminator Z(P, L, T)-L kits in hazardous areas and with JB-K-IND, TC in non hazardous areas European Headquarters Thermon Europe B.V.
Página 2
Installation must comply with Thermon requirements and be installed in accordance with the regulations as per the norm EN IEC 60079-14 for hazardous areas (where applicable), or any other applicable national and local codes.
Página 3
Crimp conductor wire pins on each conductor. Crimp braid TSX, VSX junto con Thermon JB-K-EX, TED, kits Terminator Z(P, L, T)-L en zonas clasificadas con riesgo de P2. Dégager localement la tresse et extraire le câble tel qu’indiqué. Effectuer une “queue de cochon”, explosión y con JB-K-IND, TC en zonas ordinarias.
Página 4
End Termination Instructions Power and End Termination Cable Take-off Cut and remove overjacket. Apply a liberal amount of RTV sealant to end cap and inside overcap. Slide overcap onto end of cable. Push back braid onto overjacket. Cut V-notch into end of cable. Apply a liberal amount of RTV sealant to cable and inside end cap.