Start Up Instructions - Garland GEISER 653 Q Manual De Instrucciones

Ocultar thumbs Ver también para GEISER 653 Q:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 1

6. START UP INSTRUCTIONS

6.1. LIST OF MATERIALS
This machine includes the following elements that you
will find in the box:
• Pump
• Racor ((2 - 1
") (2 - 1")
1/2
• Joint (2 - 1
") (2 - 1")
1/2
• Water filter
• O ring (2 - 1
") (2 - 1")
1/2
• Instruction manual
6.2. MOUNTING
To mount the pump it is necessary to have:
• Aspiration hose.
• Impulsion hose.
• O rings for the hoses.
Mounting:
1. Coil the racors supplied with the joints in the
entrance and exit (impulsion) hoses.
Racor
Joint
2. Place the aspiration hose with the racor in the
water entrance with the O ring.
3. Place the impulsion
hose with the racor in
the water exit with the
O ring.
Hose with O ring
25/100
4. Place the water
filter at the end of the
aspiration hose that will
be submerged in the
water.
Note: We recommend that use a filter with a no return
valve (not supplied) if the aspiration height is high.
6.3. VERIFICATION POINTS BEFORE START UP
6.3.1. PLACEMENT OF THE PUMP
Place the pump on a flat surface, stable, well
ventilated and where it will not get wet with the water
entering or exiting the pump.
Try and place the pump as close to the water to be
pumped as possible.
6.3.2. MOTOR OIL
ATTENTION! The engine of the machine comes
with no oil. Before starting the machine oil must be
added to the oil deposit.
To fill up the oil deposit, insert 0.4l of 20W-40 oil, new
and clean.
Checking the level of oil:
To check the level of oil, do so always with the
machine on a flat surface and in a stable position:
1. Unscrew the oil cap.
2. Clean the oil rod with a
rag.
3. Place the rod back in
place and screw into
place.
4. Unscrew the oil cap again.
English
Tabla de contenido
loading

Tabla de contenido