Installation And Configuration; Unpacking The System; Installing The Tooled Rail Solution - Dell PowerEdge C6100 Guia De Inicio Rapido

Ocultar thumbs Ver también para PowerEdge C6100:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

CAUTION:
Restricted Access Location
This server is intended for installation only in restricted access locations
as defined in Cl. 1.2.7.3 of IEC 60950-1: 2001 where both these
conditions apply:
Access can only be gained by service persons or by users who have been
instructed about the reasons for the restrictions applied to the location
and about any precautions that shall be taken.
Access is through the use of a tool or lock and key, or other means of
security, and is controlled by the authority responsible for the location.

Installation and Configuration

WARNING:
the safety instructions that came with the system.

Unpacking the System

Unpack your system and identify each item.

Installing the Tooled Rail Solution

WARNING:
To avoid injury, do not attempt to lift the system by yourself.
WARNING:
To avoid personal injury or damage to the system, you must adequately support
the system during installation and removal.
WARNING:
grounding conductor is necessary for the rack installation. The rack equipment
must provide sufficient airflow to the system to maintain proper cooling.
Before performing the following procedure, review and follow
Whenever you need to lift the system, get others to assist you.
The system is not fixed to the rack or mounted on the rails.
To avoid a potential electrical shock hazard, a third wire safety
Getting Started With Your System
3
Tabla de contenido
loading

Tabla de contenido