Installation Check-Up - Cimbali CASADIO Undici S2 Instrucciones De Uso E Instalación

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 75
WARNING: AFTER INSTALLATION, CHECK TO SEE IF THE MACHINE IS WORKING PROPERLY (see the
Installation Module C)
WATER CONNECTIONS
No leaks from the connections or tubes
FUNCTIONING
Boiler and operating pressures are normal.
The pressure gauge is working properly.
The self-levelling device is working properly.
The expansion valves are working properly
WARNING: ONCE THE MACHINE HAS BEEN INSTALLED AND IS READY FOR USE, BEFORE ALLOWING
THE WORKER TO START USING THE MACHINE, WASH THE INTERNAL COMPONENTS ACCORDING
TO THE INSTRUCTIONS BELOW:
GROUPS
Let each group dispense water for about a minute.
Hot Water
Continuously dispense hot water (pressing the appropriate button) until at least 2 litres of water have been dispensed
for a machine with 1 group, 5 litres for a machine with 2 groups and 8 litres for a machine with 3 groups (see the "Hot
water dispensing" chapter in the User's Manual).
STEAM
Dispense steam from the nozzles for about a minute, using the appropriate buttons.

5. Installation Check-up

.
6 EN
Tabla de contenido
loading

Este manual también es adecuado para:

Casadio undici s2 compact

Tabla de contenido