M A L F U N C T I O N S , R E P A I R S A N D W A R R A N T Y
Once any of the listed impairments is given:
▷ Correct the problem with the compressed air.
E N
▷ Replace the complete service unit.
7.2.2 Monthly Maintenance
Checking the zero point
It is recommended to check the zero point once
every month.
▷ Mill a test cube from the test blank.
The test blank is to be used exclusively for test
milling and calibration of the milling machine.
7.2.3 External maintenance
External maintenance is necessary after a defined
number operating hours. The milling machine
software will inform you appropriately.
38
8
Malfunctions, Repairs and
Warranty
8.1
Malfunctions
In case of malfunctions:
▷ Restart the software.
▷ Restart the milling machine.
▷ Restart the PC.
8.2
Repairs
Repairs may be carried out only by trained, spe-
cialised personnel.
8.3
Warranty
The warranty complies with the statutory provi-
sions. For more information, please refer to our
General Terms of Business.
9
Environmental Protection
Packaging
In terms of packaging, the manufacturer partici-
pates in country-specific recycling systems, which
ensure optimal recycling.
All packaging materials used are environmentally-
friendly and recyclable.
Waste equipment
Waste equipment contain materials that should be
sorted for environmental-friendly recycling.
▷ After the service life has elapsed, dispose of the
machine via the public disposal systems in an
environmentally-friendly manner.
The plastic parts are labelled. Thus, they can be
sorted for recycling or disposal.