2
Declaración de incorporación
Watson-Marlow Ltd
Falmouth
Cornwall
TR11 4RU
England
In accordance with the Machinery Directive 2006/42/EC that if this unit is to be installed into a machine
or is to be assembled with other machines for installations, it shall not be put into service until the
relevant machinery has been declared in conformity.
We hereby declare that:
the following harmonised standards have been applied and fulfilled for health and safety
requirements:
and the technical documentation is compiled in accordance with Annex VII(B) of the Directive.
We undertake to transmit, in response to a reasoned request by the appropriate national authorities,
relevant information on the partly completed machinery identified above. The method of transmission
shall be by mail or email.
The pump head is incomplete and must not be put into service until the machinery into which it is to be
incorporated has been declared in conformity with the provisions of the Directive.
Person authorised to compile the technical documents:
Nancy Ashburn, Head of Design & Engineering, Watson-Marlow Ltd
Place and date of declaration: Watson-Marlow Ltd, 20.04.2020
Responsible person:
Simon Nicholson, Managing Director, Watson-Marlow Ltd
6
Peristaltic Pump
Series: 530, 630 and 730 cased pumps
Safety of Machinery – EN ISO 12100
Safety of Machinery – Electrical Equipment of Machines BS EN 60204-1
Quality Management System – ISO 9001
Declaration of Incorporation
m-730en-es-01