Step 3: Solar Wiring
NOTE: PV Voc must not exceed 75 V
Step 4: Accessories (optional)
Install the Remote Temperature Sensor and Remote Meter (both
purchased separately) if required.
Step 5: Confirm Wiring
Step 6: Install Fuses
Install a 25 Amp DC-rated fuse in each fuse holder in the following
order:
1. Load circuit
2. Battery circuit
Step 7: Confirm Power-up
The SS-MPPT should begin the power-up LED sequence when battery
power is applied. Observe that the Battery Status LEDs blink in
sequence one time.
8