Federal Signal STREAMLINE LP3 Instrucciones De Instalación Y Mantenimiento página 3

Ocultar thumbs Ver también para STREAMLINE LP3:
Idiomas disponibles

Idiomas disponibles

INSTALLATION AND SERVICE INSTRUCTIONS FOR STREAMLINE™
SAFETY MESSAGE TO INSTALLERS, USERS, AND MAINTENANCE PERSONNEL
It is important to follow all instructions shipped with this product. This device is to be installed by
a trained electrician who is thoroughly familiar with the National Electric Code and will follow the
NEC Guidelines as well as local codes.
The selection of mounting location for the device, its controls and the routing of the wiring is to be
accomplished under the direction of the facilities engineer and the safety engineer. In addition, listed
below are some other important safety instructions and precautions you should follow:
• Read and understand all instructions before installing or operating this equipment.
• Disconnect light from the power supply before any installation or maintenance is performed.
• After installation, test the light system to ensure that it is operating properly.
• After testing is complete, provide a copy of this instruction sheet to all operating personnel.
• Establish a procedure to routinely check the light installation for integrity and proper operation.
• The nameplate, which may contain cautionary or other information of importance to maintenance
personnel, should NOT be obscured in any way.
Failure to follow all safety precautions and instructions may result in property damage, serious
injury, or death.
I. INSTALLATION.
A. Mounting.
1. Pipe Mounting (LP3P).
The Model LP3P strobe light may be installed on 1/2" NPT pipe. If 3/4" NPT pipe is used, a
user-supplied reducer and pipe nipple are required.
a. Attach light to pipe by turning clockwise. Use tool against wrench flats on conduit hub
for final tightening.
b. Refer to section C for information on making electrical connections.
2. Surface Mounting.
Model LP3S and LP3T strobe lights may be surface mounted directly. When surface
mounted using Model LP3S, wiring may be run through a hole in bottom of housing or
through a notch in bottom recess of housing. NOTE: Wiring should NOT be run through
notch in housing if unit operates on AC voltage.
a. Surface Mounting using LP3S.
1. Remove lens from housing by turning counter-clockwise.
2. Remove the printed circuit board assembly by depressing the two snap tabs inside the
housing and lifting the board assembly upwards.
3. Using the rubber gasket as a template, or the dimensions shown in figure 3, mark three
mounting holes and center wiring hole. Drill or punch out holes as necessary.
4. If wiring is to be run through notch in bottom recess of housing, remove 0.28"
(7.1mm) diameter knockout in bottom of housing and remove tab from rubber gasket.
a. Feed supply wires (14 to 18 AWG only) through 0.28" (7.1mm) diameter knockout
and leave enough wire inside housing to make connections to terminal block located
on top side of printed circuit board assembly.
5. Locate thick rubber gasket on mounting surface and set housing on top of gasket.
LP3 STROBE LIGHTS
-1-
loading

Este manual también es adecuado para:

Streamline lp3s