Mounting The Pro3 Kvm Switch - Belkin OmniView PRO3 Manual Del Usario

Ocultar thumbs Ver también para OmniView PRO3:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 194
Installation

Mounting the PRO3 KVM Switch

Bracket Installation (F1DA108Zea and F1DA116Zea)
Eight- or 16-Port PRO3 KVM Switches include adjustable mounting brackets
ideal for installation in 19-inch racks. The mounting brackets feature three
adjustment positions to allow you to set the PRO3 KVM Switch's face flush with
the ends of the rails or to extend the PRO3 KVM Switch past the front of the rails.
Please follow these simple steps to achieve the desired adjustment. .
Step 1
Determine how far you would like the PRO3 KVM Switch to protrude from the
rack. Select a bracket-hole scheme.
Step 2
Attach the bracket to the side of your PRO3 KVM Switch using the Phillips
screws provided. (Refer to diagram below.)
Step 3
Mount the PRO3 KVM Switch to the rack-rail assembly. (Refer to diagram below.)
1
2
3
4
5
6
7
8
11
11
Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

F1da104zeaF1da108zeaF1da116zea

Tabla de contenido