Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Installation (continued)
TOPMOUNT INSTALLATION
PREPARING THE AREA
NOTE:
Topmount sinks are dropped into the counter from above. If you are
installing an undermount sink, please see "undermount installation".
Sink template (1A) shows cut-lines for both undermount and
topmount installations. Review it carefully and follow the outer
topmount cut-lines only to install the sink over your counter.
- Remove the sink template (1A) from the box
- Center the template (1A) on the counter so that it is
parallel to the front of the counter (ensuring that it will not
interfere with the inside structure of the cabinet or the
counter) . It must clear the overhang of the counter and the
front inside face of the cabinet .
- Keep in mind that the typical setback is 3 1/2 - 4 in .
(89 mm - 102 mm) from the front of the counter to the
sink bowl (depending on the cabinet structure, the counter
overhang, the type of sink bowl, and the deck size).
- Ensure there is adequate clearance to install the mounting
hardware underneath the counter .
CUTTING THE COUNTER
1A
Topmount installation
9
CAUTION: Always wear safety goggles and gloves when
using power tools to prevent personal injury .
- Secure the sink template (1A) to the counter top using
masking tape .
- Place a support underneath the cut-out portion of the
counter to prevent it from falling during cutting . Use an
appropriate saw to cut along the topmount cutline .
- Insert the sink (A) into the cut-out in the counter to test
the fit. Make adjustments to the cut-out, if necessary.
Tape
Please contact 1-855-HD-GLACIER for further assistance .
Setback
3 1/2 - 4 in.
(89 mm - 102 mm)
HOMEDEPOT .COM/GLACIERBAY

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Qk024

Tabla de contenido