Flat Roof Installation
Montaje en tejado plano
9
18 ft/lb
Securely tighten the four bolts with a torque of 18 ft lb
Apriete los cuatro tornillos con un par de 18 ft lb
Connect the cold water inlet and fill the collector
Conecte la entrada de agua fría y llene el captador
10
Please use the thread adaptors
for US - NPT threads!
WARNING
6.2
< 30 ft lb
6.1
Remove the foil within 14 days of installing the Solpal
but never before the system is filled!
12
6.1
Retire la lámina en los 14 días siguientesa la instalación de Solpal
but never before the system is filled!
20
9b
Do not use more
than 30 ft/lb tourque!
M12x80
9a
Connect the hot water outlet
Conecte la salida de agua caliente
11
Do not use more
than 30 ft/lb tourque!
6.1
TO AVOID DAMAGE, DO NOT INSULATE VALVES!
PARA EVITAR DAÑOS, NO AÍSLE LAS VÁLVULAS.
13
6.1
6.1
6.1
EN
ES
9b
< 30 ft lb
WARNING
6.3
6.1
6.1
5