Chapter 1: I
This manual describes how to set up and operate the SprintPack
Power System, and contains what you need to know to perform the
following:
•
Recharge the SprintPack Batteries using approved power sources
•
Power an LTV
•
Perform simple troubleshooting on the SprintPack Li-Ion Power System
For service tests and major maintenance operations, contact Vyaire Medical.
Operator's Safety Information
All Operators are to read and understand the following information about
Warning, Caution, and Note statements before operating the LTV
SprintPack Li-Ion Power System.
WARNING
"
" statements alert the reader to potentially hazardous situations
Warning
which, if not avoided, could result in death or serious injury.
CAUTION
"
" statements alert the user to potentially hazardous situations
Caution
which, if not avoided, could result in equipment damage.
NOTE
"
" statements contain additional information to assist in the
Note
proper operation of the SprintPack Li-Ion Power System.
32328-001 Version A
NTRODUCTION
™
Ventilator using the SprintPack Li-Ion Power System
Operator's Manual – SprintPack
™
Li-Ion
™
1-1