Metalworks CAT1200 Instrucciones De Uso página 26

Cabina chorreadora de arena
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

®
CAT1200 - NLFRENES - v1.0 - 05032015
EN
Step 7
As shown, the pressure regulating valve is installed on the feet with M6x12 screws, the orange pipe on the foot pedal
is connected to the large funnel right side hole, and than the sand blasting gun, the other end is connected with a sand
suction pipe (as shown).
The dust collector is installed in the upper cabinet on the side plate, vacuum assembly line is inserted in the socket on the
box by switch on the right side of the trough plate.
Sand blasting gun
The end is connected with a sand suction pipe, the other
end is connected to the fast screw elbow of the funnel.
26
Tabla de contenido
loading

Este manual también es adecuado para:

754751579

Tabla de contenido