Tetenal Colortec C-41 Manual De Instrucciones página 5

Ocultar thumbs Ver también para Colortec C-41:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 19
ALTERNATIVE DEVELOPMENT AT 30 °C / 86 °F
Processing should be done at 30 °C / 86 °F if standard development at 38 °C / 100 °F
produces uneven results.
1 l
Step
0 Pre-heat the
developer drum
1 Colour Developer
2 Bleach Fix
3 Rinse
4 Stabilizer
NOTES ON PROCESSING STEPS:
Rinses with flowing water, change water every 30 seconds or rinse for longer periods.
RAPID-DEVELOPMENT AT 45 °C / 113 °F (ONE-SHOT DEVELOPMENT)
Step
0 Pre-heat the developer drum
1 Colour Developer
2 Bleach Fix
3 Rinse
4 Stabilizer
NOTES ON PROCESSING STEPS:
Depending on the processor used, the rotation speed and the type of film, the time for
the colour developer is to be lengthened in the case of under-development (+ 10 s) and
shortened in the case of over-development (- 10 s).
The stabilising process may also be carried out days later.
Tempeature
Processing time
films
30 ± 0.5 °C
86 ± 0.5 °F
30 ± 1.0 °C
8' 00''
86 ± 1.0 °F
30 ± 3.0 °C
6' 00''
86 ± 3.0 °F
30 - 40 °C
86 - 104 °F
20 - 40 °C
68 - 104 °F
45 °C / 113 °F
45 °C / 113 °F
45 °C / 113 °F
45 °C / 113 °F
20-40 °C / 68 -104 °F
1-4
5-8 / 1-16
films
5' 00''
9' 00''
8' 00''
6' 00''
1' 00''
Tempeature
9-12
13-16
films
films
10' 00''
11' 00''
12' 00''
20' 00''
Processing time
2' 00''
2' 00''
3' 30''
4 x 15''
0' 30''
5
Tabla de contenido
loading

Productos relacionados para Tetenal Colortec C-41

Este manual también es adecuado para:

102230Colortec c-41

Tabla de contenido