1. Installation of drain hose.
-
The diameter of the drain hose should
be greater than, or equal to the dis-
charge pipe (vinyl with a 32 mm. outer
diameter).
-
Keep the hose at a slight 1% tilt mini-
mum so as to avoid internal air pockets.
-
Should the hose not be inclined suffi-
ciently, add a slight elevation.
-
To avoid detachment of the hose, locate
fasteners at at least 1-1.5 m.
-
Use hose (1) and clamp (2). Insert hose
over the grey area. Screw on the clamp
until the head protrudes about 4 mm.
-
Use the larger insulation to cover the
drain system.
-
Insulate the drain inside the room.
INSULATION (8)
GREY TAPE
Torque
CLAMP (2)
30 to 40 N. m
45 to 50 N. m
60 to 65 N. m
70 to 75 N. m
Precautions for elevating the
hose
(Fig. 8)
- Install elevation at a height of less than
280 mm.
1 a 1.5 m
1% SLOPE
Fig. 6
CLAMP (2)
HOSE (1)
FILLER (10)
< 4 mm
Fig. 7
GB
- Install the elevation at at least 150 mm.
from the unit, and with a correct angle.
< 150 mm
1 a 1.5 m
DRAIN
OUTLET
DRAIN
ELEVATION
GASKET
CEILING
Fig. 8
Attention: (Figs. 9 and 9a)
- The tilt of the hose supplied could be 75
mm. or less, without the hose bearing any
additional stress.
Fig. 9
- Follow this advice to install a multiple sys-
tem.
CONVERGENT MULTIPLE
SYSTEM TYPE T
Fig. 9 bis
2. Once installation is concluded, make
sure water flows correctly.
-
Through the inspection hole, add ap-
proximately 600 cm³ of water to the drain
system. Pour the water slowly and check
flow.
-
Once wiring installation is concluded,
check drain flow in cooling mode.