Installation(24K,36K,42K,48K,60K) - Hisense 12К Manual De Instrucciones

Ocultar thumbs Ver también para 12К:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

3.3 Installation(24K,36K,42K,48K,60K)

3.3.1 Opening of False Ceiling and Suspension Bolts
(1) Determine the final location and installation direction of the indoor unit paying careful attention
to the space for the piping, wiring and maintenance.
Pattern board for installation is printed on the packing. Cut off the pattern for opening the false
ceiling and installation suspension bolts.
(2) Cut out the area for the indoor unit in the false ceiling and install suspension bolts, as shown
in Fig.3.3.
(3) Check to ensure that the ceiling is horizontally level, otherwise drainage can not flow.
(4) Strengthen the opening parts of the false ceiling.
(5) Mount suspension bolts, as shown in Fig.3.4.
3.3.2 Mounting Position of the Indoor Unit
Fig.3.5 Mounting Position
Fig.3.3 Opening of False Ceiling and Suspension Bolts
Fig.3.4 Mounting Suspension Bolts
Model
24K, 36K
42K,
48K,60K
Installation and Maintenance
3
15
Tabla de contenido
loading

Este manual también es adecuado para:

18к24к36к42к48к60к

Tabla de contenido