ELICA ELG630S2 Guía De Instalación, Uso Y Mantenimiento página 7

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Ceiling ducting
If the duct will vent straight up to the ceiling:
Use level to draw a line straight up, from the centerline on
the template to the ceiling.
Measure at least 4
5
" from the back wall to the circle cen-
8
ter of an 6½" hole on the ceiling.
Wall ducting
If ductwork will vent to rear:
NOTE: for minimum duct cover extension we suggest to use a
round to rectangle duct adapter.
Use a level to draw a line straight up from the centerline
on the template.
Measure at least 26
" (the measure might vary depending
1
2
on the elbow used) above the pencil line that indicates
the bottom installation height, to the circle center of an
6½" diameter duct hole (hole may be elongated for duct
elbow).
House wiring location
The junction box is located on the top left side of the
hood.
Wiring should enter the back wall at least 20
the bottom of the installation height, and within 7
4
"of the left side of the centerline.
7
8
4
5
" circle
8
center to wall
6
1
"
2
dia. hole
C L
FOR
WALL
VENT
DUCT
Wall
1
" above
4
" and
5
8
FOR CEILING
VENT DUCTING
Ceiling
Circle center at 26
1
"
2
above the marked
bottom line.
Horizontal straight
pencil line
Install framing for hood support
If drywall is present, mark the screw hole locations.
Remove the template.
Cut away enough drywall to expose 2 vertical studs at the
holes location indicated by the template. Install two hori-
zontal supports at least 4" x 2" between two wall studs at
the bottom and upper mounting holes installation location.
The horizontal support must be flush with the room side of
the studs. Use cleats behind both sides of the support to
secure to wall studs.
Reinstall drywall and refinish.
Framing must be capable of supporting 100 lbs.
IMPORTANT:
6
1
Mounting the hood
Install the 6" round transition as shows the image below.
The installation screws and the 6" round transition are included
on the hood package.
I WARNING
2 PEOPLE ARE REQUIRED TO LIFT AND POSITION THE
HOOD ONTO THE MOUNTING SCREWS.
Place the template on the wall along the horizontal line,
make sure the template is leveled and centered with the
centerline.
Mark "upper" screw holes locations in the wall.
IMPORTANT. Check to be sure that hole locations are leve-
led and correctly centered by the vertical centerline.
Drive "upper" wood screws by hand. Leave ¼ " of distance
between the screw head and the wall.
Remove the grease filter and mount the hood onto the
"upper" screws.
" min. opening for ductwork
2
View from
rear cleats
1"x6" min.
mounting
support
Centerline of
installation
space
Ø 6"
7
Tabla de contenido
loading

Este manual también es adecuado para:

Elg636s2

Tabla de contenido