4
Configuration
Use the following instructions to configure the 3 Zone Control Panel.
1.
Open J1 jumper for dual transformer installations.
2.
Open J2 short cycle protection jumper for system test.
Note: Replace J2 when system testing is completed or leave J2 open if compressor has built in
short cycle protection.
Press ▲ and then press ▲ to raise or ▼ to lower the Hi Temp cutout.
3.
Press ▼ and then press ▲ to raise or ▼ to lower the Low Temp cutout.
4.
Press ▲ and ▼ at the same time to adjust purge time. Press ▲ to raise or ▼
5.
to lower the purge time.
Braeburn
Figure 4
SUPPLY TEMP
HI TEMP
LO TEMP
PURGE
DELAY
▲
HI/LOW LIMIT
CUTOUT ADJUST
3-Zone
JI REMOVE TO SEPARATE
RH AND RC TERMINAL
RH
RC
Y1
Y2
G
G2
J2-SHORT CYCLE
PROTECTION
W1
AUX
W2
O/B
C
8
J1 jumper
HI/LOW
temp cutout
adjustment
J2 jumper