CHAPTER 3. START-UP. ADJUSTMENT AND OPERATION CONTROLS.
In principle, the connection of the system and the preliminary operations must be carried out
as indicated in CHAPTERS 2 and 3 of the GPS power source instructions manual.
After mounting the modular system the following preliminary operations must be carried out
on the cooling module:
WCS-520
1º- FILL UP THE COOLING TANK.
G
Fill the t ank within the indicated limits with
connection extension lead connected.
2º- PURGING THE AIR.
In order to eliminate any air on the incide
of the cooling circuit.
3º- PUMP UNLOCKING.