Installation Checklist - Amana BR22S6E Manual De Uso

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Installation Checklist

This checklist is for personal records only.
Consumer
Installer
Notes
Consumer's Signature
Doors
Handles are solidly attached to doors.
Handle side of door is
loaded with food.)
Doors seal completely to refrigerator cabinet.
Leveling
1
Refrigerator is tilted
/
Toe grille is properly attached to refrigerator.
Ice Maker
Water supply to refrigerator is turned on.
Water leaks are not present at connection between household water supply and
refrigerator. (After 24 hours, consumer should check connection for water
leaks.)
Ice maker arm is in on position for ice production. (It may take up to 24 hours
for first harvest of ice.)
Product Literature
Owner's manual is reviewed including the following information.
• product registration card
• Refrigerator and freezer controls
• Chiller Fresh
system
• Garden Fresh
crispers
• normal operating sounds
Installer's Signature
1
/
" (3 mm) higher than hinge side. (Door lowers when
8
" (6 mm) from front to rear.
4
Installer's Company Name/Phone Number
8
Date
Tabla de contenido
loading

Tabla de contenido