Proto-Aire EZ I/O Manual
It is the responsibility of the installer to ensure that the final equipment installation meets all
applicable code requirements.
N.E.C. and local electrical code restrictions must be followed for electrical clearances and all
other installation requirements.
Proto-Aire EZ — Physical Data
Dimensions for the three fan units are typical for the following:
119 MIN
Provide clearances as shown to ensure adequate airflow, reduce the potential for air recirculation,
facilitate service accessibility, and to maintain compliance with electrical code requirements. It is the
responsibility of the installer to ensure that the final equipment installation meets all applicable code
requirements.
Suggested rigging setup is illustrated. Be sure that lifting cables/straps do not damage piping stubs, coil
surface, or rain guard. Full perimeter support under unit rail foundation required.
90.5
A
MINIMUM CLEARANCE REQUIREMENTS:
ATTACH LIFTING
SHACKLES HERE.
50
57
7
DETAIL A
4X
3090249_D