Important - Calorex AW629 Manual De Instalación Del Propietario

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

h. When the pipework installation is complete the pool pump should be switched on and the system tested for
leaks. Also check the filter gauge to see that there is not an excessive increase in back pressure. If
everything is then working normally the water circulating system is ready to use.
i.
Water circuit to and from unit to be capable of maintaining within specified limits the rate of flow required by
heat pump (see data sheet).
j.
All pipework must be adequately supported with allowance for expansion/contraction especially with plastic
pipework.
k. It is recommended that when installing water systems the last connections to be made in the system
should be the breakable connections to avoid any stresses on to the unit connections.

IMPORTANT

1. All Pool Purifying Devices and Chemical Injection Systems to be fitted down stream of heat pump
unless installation is as per Filter dosing (See figure 4). This includes the practice of dosing
chemicals direct into Skimmer Basket, which results in concentrated corrosive liquids passing over
metal components.
2. Water quality must be maintained as follows:
pH:
Total Alkalinity:
Total Hardness:
Total dissolved solids:
Saline Water
Chlorine - free Cl range
Ozone
Bromine
Baquacil
Aquamatic Ionic Purifier
Tam Pure Purifier
Sherwood Purifier
3. Maximum pressure of water in heat pump circuit should not exceed 3.5kg/cm
7.4 ± 0.4
80 - 120 ppm as CaCo
3
100 - 300 ppm as CaCo
Max. 3000 ppm
Maximum concentration 6% wt/wt
1.0 - 3.0 ppm
0.8 - 1.0 ppm
2 - 3 ppm
25 - 50 ppm
Maximum 2 ppm Copper
Maximum 2 ppm Copper
Maximum 2 ppm Copper
Page 8
3
(50 psi)
2
Tabla de contenido
loading

Este manual también es adecuado para:

Aw829

Tabla de contenido