Upon installation completion, verify that the SMPS is functioning by
conducting the "Verify Modules" and Bus Communication tests, from the
ProSYS menu.
Technical
Specifications
General
Efficiency: 93% @ 1A load, 85 % Min @ 3A full load
SMPS card dimensions (HxWxD): 90mm x110mm
Weight: 0.14Kg
Main Panel Connection: RS485, 3 Wire Bus, up to 300m from Main panel.
Input
Power: 16.5VAC @ 50VA (via 230VAC/16.5VAC/50Hz transformer).
Rechargeable Standby Battery: 12V Up To 21 Amp-Hours (AH)
Output
Auxiliary output: 3A @13VDC
Bell/Siren output: 1.7A @13VDC
Overload Protection: Automatic Electronic Protection
Utility Output
12VDC @ 3A max Dry Contact Relays
Environmental
Operating temperature: 0 -55 C
16
Probable
Meaning /
Cause
PS/UO
Dipswitch ID
has been
changed
Incorrect UO
programming
Communication
with PS or UO
is not stable
SMPS - Installation Guide
Response
Reset the SMPS (see User
Programming Menu
disconnect battery and mains wires, wait
for few seconds, and reconnect the battery
and mains wires.
Using the ProSYS menu, verify that the
UO functions are appropriately
programmed
The distance between ProSYS and SMPS
is too long; verify appropriate distance and
gauge of wiring (refer to Table 1: Wire
Gauge).
on page 13),