Prepare The Site - Kohler K-700 Guía De Instalación Y Cuidado

Bañera de hierro fundido esmaltado
Ocultar thumbs Ver también para K-700:
Tabla de contenido
1.

Prepare the Site

Drop-In or Raised-Deck Installations
Installations encastrées ou sur podium
Instalaciones de sobreponer o en cubierta elevada
Provide a 1/16" (2 mm) gap between the bath rim
and the framing.
Fournir un espace de 1/16" (2 mm) entre le rebord
de la baignoire et la charpente.
Provea una separación de 1/16" (2 mm) entre el
borde de la bañera y la estructura de postes de
madera.
NOTICE: Measure your product for site preparation. Visit the product page at
www.kohler.com for more information.
Flooring
Provide adequate floor support.
NOTICE: To ensure a successful installation, it is critical that the bath be installed on
a level subfloor.
Verify the subfloor is level. Adjust for level, if necessary.
For freestanding installations, apply water-resistant sealant to the subfloor. This
will reduce the risk of water damage.
Framing
CAUTION: Risk of property damage. Do not support the bath by the rim. The
bath must be supported by the feet only.
For drop-in or raised-deck installations:
NOTICE: To ensure the bath does not rest on the rim, a 1/16" (2 mm) gap must exist
between the underside of the rim and the framing. When constructing the framing,
take into account the 1/16" (2 mm) gap and the thickness of the finished wall/deck
material. If these factors are not taken into account, the bath will not fit in the
installation area.
Construct the framing. Ensure a 1/16" (2 mm) gap will exist between the
underside of the rim and the framing.
Use the cut-out template packed with the bath to carefully lay out and cut the
rough deck material.
Plumbing
For drop-in or raised-deck installations:
Use the cut-out template provided with the bath to properly mark the water
supply and drain locations in relation to the determined location of the bath.
1084188-2-B
4
Kohler Co.
Tabla de contenido
loading

Tabla de contenido