Swing-N-Slide NE 5010 Manual De Instrucciones página 6

Ocultar thumbs Ver también para NE 5010:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

PROJECT 514
Fig. 1
2-1/2" screw
Fig. 1b
2" x 4" x 47"
(2)
2-1/2" screws
(Per joint)
UNDER DECK VIEW
7-1/4"
GAP
(2)
2-1/2" screws
(Per joint)
Fig. 1a
1/2" GAP
7-1/4"
4' Climbing Rock Wall will require
8 Climbing Rocks
(2) Bags of
NE 4543S
Rock Wall Assembly
1. Install Rock Wall Support Board as shown in (Fig. 1).
2. Assemble Rock Wall as shown in (Fig. 1a).
3. Install Rock Wall on unit as shown in (Fig. 1b).
Note: Make sure the 2" x 4" supports do not
interfere with the mounting of the climbing
rocks.
6
FLUSH
(2)
2-1/2"
screws
(Per joint)
1/2"
GAP
5-1/4"
NOTE:
Climbing Rocks.
Tabla de contenido
loading

Tabla de contenido