Gas Hook Up; Step 5: Electrical Requirements, Connection And Grounding - Thermador PROFESSIONAL PCG305P Manual De Instalación

Ocultar thumbs Ver también para PROFESSIONAL PCG305P:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

CAUTION
When connecting unit to propane gas, make certain the
propane gas tank is equipped with its own high pressure
regulator in addition to the pressure regulator supplied
with the appliance. The pressure of the gas supplied to
the appliance regulator must not exceed a 14'' water
column (34.9 mb).
CAUTION
The appliance must be isolated from the gas supply
piping system by closing its individual manual shut-off
valve during any pressure testing of the gas supply
piping system at test pressures equal to or less than 1/2
psig (3.5kPa).
The appliance and its individual shut off valve must be
disconnected from the gas supply piping system during
any pressure testing of the system at test pressures in
excess of 1/2 psig (3.5kPa.).
When checking the manifold gas pressure, the inlet
pressure to the regulator should be at least 6.0" W.C. for
natural gas or 11.0" for propane.
Do not attempt any adjustment of the pressure regulator.
WARNING
Do not use a flame of any kind to check for gas leaks.

Gas Hook Up

A manual gas shut-off valve must be installed external
to the appliance, in a location accessible from the front,
for the purpose of shutting off the gas supply. The
supply line must not interfere with the back of the unit.
Make sure the gas supply is turned off at the manual
shut-off valve before connecting the appliance.
The installer should inform the owner of the location of
the gas shut-off valve. Make sure all users know where
and how to shut off the gas supply to the rangetop.
The gas supply connections shall be made by a
competent technician and in accordance with local
codes or ordinances. In the absence of local codes, the
installation must conform to the National Fuel Gas
Code ANSI Z223.1/NFPA54-current issue.
Always use pipe-sealing compound or Teflon
the pipe threads, and be careful not to apply excessive
pressure when tightening the fittings.
All installer-supplied parts must conform to applicable
codes.
English 10
Leak testing of the appliance shall be in accordance
with the following instructions.
Turn on gas and check supply line connections for
leaks using a soap and water solution.
Bubbles forming indicate a gas leak. Repair all
leaks immediately after finding them.
Step 5: Electrical
Requirements, Connection
and Grounding
Voltage
120 VAC
WARNING
is turned off until the rangetop is installed and ready to
operate.
Before installing, turn power OFF at the service panel.
Lock service panel to prevent power from being turned
ON accidentally. Always disconnect appliance from the
electric supply either by disconnecting power cord or
shutting off the breaker at the service panel before
servicing the appliance.
Before you plug in an electrical cord, be sure all
controls are in the OFF position.
All 120 Volt rangetop models must be plugged into a
mating 3-Prong, Grounding-Type Receptacle. The
receptacle must be connected to a properly dedicated
grounded and polarized electrical power supply rated
at 120VAC, Single Phase, 60HZ (see Figure 10).
CAUTION
Improper grounding or reverse polarization will cause
malfunction (such as continuous sparking of the burner
igniters). This can damage the appliance and can create
a condition of shock hazard. If the dedicated circuit is not
®
tape on
correctly grounded and polarized, it is the responsibility
and obligation of the installer and user to have the
existing receptacle changed to a properly dedicated
grounded and polarized receptacle. This must be
accomplished in accordance with all applicable local
codes and ordinances by a qualified electrician. In the
absence of local codes and ordinances, the receptacle
replacement shall be in accordance with the National
Electric Code. (See Figure 10.)
Circuit Rating
Frequency
10 Amps
60 Hz.
ELECTRICAL SHOCK HAZARD
To avoid the risk of electrical shock, personal
injury or death; verify electrical power is
turned off at the service panel and gas supply
Phase
Single
Tabla de contenido
loading

Tabla de contenido