Bosch PROFESSIONAL GSR 12 VE-2 Instrucciones De Servicio página 15

Ocultar thumbs Ver también para PROFESSIONAL GSR 12 VE-2:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 24
2 609 932 156.book Seite 4 Dienstag, 29. März 2005 9:26 09
Switching On and Off
To start the machine, press the On/Off switch 4
and keep it depressed.
The machine runs with variable
speed between 0 and maximum,
depending on the pressure applied
to the On/Off switch 4. Light pres-
sure results in a low rotational
speed thus allowing smooth, con-
trolled starts. Do not strain the machine so heav-
ily that it comes to a standstill.
To switch off the machine, release the On/Off
switch 4.
Run-on Brake
When releasing the On/Off switch 4 the speed of
the drill chuck is reduced to a stop, thus prevent-
ing the run-on of the tool.
For screwdriving applications, wait until the screw
is flush with the material and then release the
On/Off switch 4. The screw head does not pene-
trate into the material then.
Gear Selection, Mechanical
Two speed ranges can be preselected with the
gear selector 1:
1st gear:
Low rotational speed, high power.
2nd gear:
High rotational speed, less power.
The gear setting can be changed while the ma-
chine is running, however, not while under load.
It is recommended to carry out the switching
while the machine is at a standstill. If the gear se-
lector 1 cannot be slid into the end position while
the machine is at a standstill, turn the chuck
somewhat or briefly press the On/Off switch 4.
Fully Automatic Spindle Locking
(Auto-Lock)
The drill spindle is locked when the On /Off
switch 4 is not pressed.
This makes quick and easy changing of the tool
in the drill chuck possible.
The locked drill chuck enables retightening of
projecting screws by using the switched-off ma-
chine as a screwdriver.
15 • 2 609 932 156 • TMS • 21.02.05
Setting the Torque
Carry out a practical test to determine with which
of the 15 settings of the torque setting ring 2 the
screws are driven flush into the material.
Low setting, e. g., small screws, soft
1
materials.
High setting, e. g., large screws, hard
15
materials.
With the correct setting, the clutch disengages as
soon as the screw is driven flush into the material
or the set torque is reached. Select a higher set-
ting when driving out screws, or set to the "Drill-
ing" symbol.
Drilling and Impact Drilling
Drilling
Set the torque setting ring 2 to the "Drill-
ing" symbol.
Hammer Drilling
(GSB 12 VE-2/GSB 14,4 VE-2/
GSB 18 VE-2/GSB 24 VE-2)
Set the torque setting ring 2 to the "Hammer Drill-
ing" symbol.
Replacing the Drill Chuck
The locking screw 15 secures the drill chuck
against loosening from the drill spindle. Fully
open the drill chuck and completely unscrew the
locking screw 15 by turning in clockwise direction
E
(see figure
).
Loosening the Drill Chuck
(see figure
)
C
Place the machine on a stable surface (e. g.
workbench). Hold the machine firmly and loosen
the chuck by turning to the left, as when unscrew-
ing a screw ( ). Loosen a tight chuck by giving
the long end of the Allen key 14 a sharp blow.
Tightening the Drill Chuck
(see figure
)
D
The drill chuck is mounted in reverse order ( ).
English - 4
Tabla de contenido
loading

Tabla de contenido