Air-Hydraulic Pump Jpl - Jung JPE 30 NVR Instrucciones De Servicio

Bombas
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 39

4.3 Air-hydraulic pump JPL 15

8
3
WARNING
If multiple jacks are connected, make sure that the load
is lifted/lowered evenly. There is a danger of tipping.
Injuries might occur.
CAUTION
Only connect and shut off hydraulic hoses on depres-
surized jacks and pumps. Not under load / in working
position.
Setting the working pressure
> Connect the compressed air hose to the compressed
air connection (3).
- 32 -
2
4
5
6
1
2
7
> Connect the pressure gauge (8) to the
connections (7).
> Press the foot switch (4), read off the working
pressure from the pressure gauge (8) and set the
desired pressure via the pressure adjusting screw (6).
> Set the working pressure by turning the adjusting
screw
• Increase pressure: Turn in clockwise direction
• Reduce pressure: Turn in counterclockwise direction
> Then actuate the foot switch (5) to relieve pressure.
© JUNG Hebe- und Transporttechnik GmbH
Pumps
1
Tabla de contenido
loading

Este manual también es adecuado para:

Jpe 30/4 nvrJpe 55 nvrJp 26Jpl 15

Tabla de contenido