HALFEN HK5 Brickwork support brackets
Vertical Adjustment
Concrete surface
Notched bracket head
U-Plate
HALFEN T-head bolt
or chemical anchor
Nut
Washer
Slotted adjustment
plate
Rough vertical adjustment, 1
Place the
slotted adjustment plate
groove of the toothed back.
Precise vertical adjustment, 2
By moving the
slotted adjustment plate
the right or to the left, the bracket is moved up or
.
down respectively
Tightening:
When vertical adjustment is fi nalized, tightened the nut
to the required torque according to the table below.
Torques
Fixing system
HS HALFEN Bolt HS
HB-V Chemical anchor
HB-VMZ Chemical anchor
HB-VMU Chemical anchor
HB-BZ Bolt anchor
* See approval
Subject to technical changes.
© 2019 HALFEN · INST_HK5 10/18 · www.halfen.com
st
step:
into the appropriate
nd
step:
horizontally to
to HALFEN Cast-in channel
only for non-cracked concrete
for cracked and non-cracked concrete
for masonry and non-cracked concrete
for cracked and non-cracked concrete
The adjustment plate is
to engage in the notch
Top
by the short side of the
angle.
The short side of the
angle must be at the
top, the long side of
the angle is adjacent to
the wall.
Bottom
A notch
should rest securely on the adjust-
ment plate and the slot edge should rest securely
on the bolt. If required, slightly
with a hammer
.
Required torque for thread diameter:
M 10
15 Nm
20 Nm
15 Nm
20 Nm
35 Nm
Assembly Instructions
Correct
In-correct
tap the bracket
+ 20 mm
− 20 mm
Bracket moves
up
Bracket moves
down
M 12
M 16
25 Nm
60 Nm
40 Nm
80 Nm
25/30 * Nm
50 Nm
40 Nm
60 Nm
50 Nm
110 Nm
5