ShelterLogic Pull-Eaze Manual De Instrucciones página 3

Idiomas disponibles

Idiomas disponibles

4. ATTACH "S" HOOKS AND ROPE TO THE INSIDE OF THE DOOR PANEL
A. Cut 2 more slits inside the shelter on door above the webbing, about 18 inches up from the zipper. Hang
each pulley here.
Door Panel Interior
B. Pass the rope from the knot down under the door and back up to the first pulley. Hook each rope on each
pulley. Do this on both sides.
C. On the opposite side of the cleat, bring one rope across top of the door to the other pulley and pass it
through that pulley. You should have 2 pieces of rope hanging on the same side of the shelter as the cleat.
D. Hand start to roll up the door holding the 2 ropes together. The door will start to roll up around the pipe from
the bottom as you pull the ropes, similar to a window shade. Secure the ropes to cleat at preferred height.
INSIDE VIEW OF DOOR PANEL
Page 3
Approximately
18"
05_10077-00800_E2
loading

Este manual también es adecuado para:

1007700800