dirna Bergstrom bycool blue line FLAT Instrucciones De Montaje página 48

Volvo
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

FLAT
EN
Valid for Standard and Globetrotter XL cabins
8
Place the cap on the tank, and cut at 100 mm;
insert "T" and connect the smallest section tube
to this, marking it with a white tape, and ensure
that the radius of the curve is sufficient so as
to prevent constrictions.
9
Connect the protected cables to the evaporation
equipment boxes and water input tube.
A. Connect the impulsion tube from the
evaporation equipment to the pump.
B. Connect the pump and level cabling.
10
Connect the battery cables as indicated.
A
48
®
8
9
B
10
Tabla de contenido
loading

Este manual también es adecuado para:

Bycool

Tabla de contenido