FLAT
7
Attach the channelling equipment to the front
using LOCTITE superglue 3 or similar, in order
to facilitate the assembly of the equipment
and ensure the flows of cold air through the
windows.
8
Position (2) attachment supports on the studs
between the cover and the cabin ceiling.
8a
Connect cables and place the front section on
the attachment supports with (4) flat washers of
6 mm, attaching it with (4) M6 self-locking nuts
and thread without tightening.
Important: The channelling equipment should
come to a stop against the foam rubber in order
to prevent leakages of air.
Only for standard cabins (L2H2)
7
Area to apply
adhesive
8a
8a
31
EN
®