Front Post Installation:
Remove eight Bolt M8x15 (28), four Washer Ø8x Ø20x2.0 (31),eight spring washer Ø8 (18),four
Curve Washer Ø8x Ø16x2 (63)from the Main Frame (1). Connect the Sensor Wire I(59) from the
Main Frame (1) to the Middle wire (20) from the Front Post (2). Insert the Front Post (9) onto the
tube of the Main Frame (1) and secure with eight Bolt M8x15 (28), four Washer Ø8x Ø20x2.0
(31),eight spring washer Ø8 (18),four Curve Washer Ø8x Ø16x2 (63)that were removed. Tighten
bolts with the S6 Allen Wrench provided.
49