5. ELECTRICAL CONNECTION:
The projectors are supplied with a 2x1.5mm
The projector must be connected to a safety transformer. Ensure that a 12 V AC power supply reaches the pro-
jector. The projector's performance may be affected in the event of a voltage drop. The projector must receive
a 12 V AC power supply.
The transformer must be properly sized to supply the right VA to each LED projector that is wired.
This projector only works underwater.
Control systems
• Monocolour models do not have a control system. They can only be turned on and off.
• RGB models are operated using a remote control, which comes with the projector.
B
-Click the side selector to activate the remote control (A).
- Extend the antenna to ensure good signal coverage (B).
It enables the following scenarios to be created: 1. Fade 1 / 2. Fade 2 / 3. Smooth / 4. Flash / 5.
Red / 6. Purple / 7. Green / 8. Cyan / 9. Blue / 10. White / 11. Orange / 12. Off.
A
It has a 12 V battery of 23 A.
In both cases, you should make sure that the voltage received by the lamp is never more than 12V AC.
6. MAINTENANCE:
To remove the projector to the border of the swimming pool (Fig. 1) insert a screwdriver through the upper hole of the
ornament and press on the spline of the mount until the projector is released (Fig. 7-8).
Pull up on the projector until it is released from the lower groove and can be removed from the swimming pool.
Attention:
• Before any handling ensure that there is NO voltage supplied to the projector.
7. START-UP:
Ensure that the voltage the lamp receives is never greater than 12V ~.
The projector should only operate underwater while secured to the vertical walls of the pool. Never switch on the projector
if it is not underwater.
8. SAFETY WARNINGS:
• If the cable or wiring of this luminaire becomes damaged, it may only be replaced by the manufacturer or one of its
service engineers, or a person with a similar qualification, in order to prevent any risks.
• The light source of this luminaire may only be replaced by the manufacturer, one of its service engineers or a person
with a similar qualification.
• The persons who are in charge of assembly should have the required qualifications for this type of work.
• Avoid making contact with the electric voltage.
• Comply with the current standards regarding accident prevention.
• In this regard, the IEC 364-7-702 standards must be observed: WIRING IN BUILDINGS. SPECIAL WIRING. SWIMMING
POOLS.
• Any operation related to the maintenance or replacement of parts should be performed with the projector disconnected
from the electric power system.
• Do not handle with wet feet.
• This projector is resistant to pool treatments described below, always that the concentration values do not
exceed the following levels:
TYPE OF TREATMENT (concentration in water):
Chlorine (2mg/l), Bromine (5 mg/l), Salt electrolysis = Na Cl: (6 g/l).
Attention: Please note that the Ph of pool water always must be between 7.2 and 7.6.
2
Cu H07RNF cable.
4